Craftsbury Planning Commission, taking the long view.
Craftsbury's Planning Commission prepares the Town Plan and other planning projects assigned by the Selectboard.
Planning in Craftsbury is accomplished by 9 residents appointed by the Selectboard. Meetings are called at the direction of the Chair. Membership appointments are for three year renewable terms.
Determining Projects
Projects are designed by the Selectboard and supervised through periodic reporting at meetings of the Selectboard and at the Annual Town Meeting.
The work of this group of residents has resulted in the following:
Flood Plain Regulations —adopted 6 June 2001.
Revised 2016 Town Plan (amended January 21, 2020)
Telecom Ordinance —adopted 16 May 2006
Do I need a Permit?
Download the State's Permit Handbook
Call the Environmental Assistance Division: (800) 974-9559
DOWNLOAD GROUNDWATER SURVEY CONDUCTED BY JON KIM AND GEORGE SPRINGSTON IN SUMMER 2011 (PDF)
ANR Drought Reporter